2025-01-12–2025-04-14 MACHINES PREPARED AND ACCEPTED BY CUSTOMERS AFTER MAJOR OVERHAUL AND MODERNISATION: 16К20, 6Р82, HECKERT BR40/2x1250 RADIAL DRILLING MACHINE
Following acceptance checks for quantity, quality, operation and technical accuracy, the machines were shipped to the customers.
2025-02-26 A MAJOR OVERHAUL OF THE SPEED GEARBOX AND RESTORATION OF THE ELECTRICAL CONTROL EQUIPMENT ON THE РТ755 SCREW-CUTTING LATHE, distance between centres-12000 MM, WERE COMPLETED. MODERNISATION INCLUDED FULL RESTORATION OF THE ELECTRICAL CABINET, REPLACEMENT OF CABLE RUNS AND METAL CONDUITS, AND COMMISSIONING.
The work was successfully handed over to the customer.
2025-02-12 INSTALLATION, MODERNISATION, ROUTINE REPAIR, ALIGNMENT AND COMMISSIONING OF THE VERTICAL TURNING LATHE, MODEL 1557, WITH A FACEPLATE DIAMETER OF 3200 MM, COMPLETED.
The work was successfully handed over to the customer.
2024-06-30–2024-12-30 MACHINES PREPARED AND ACCEPTED BY CUSTOMERS AFTER MAJOR OVERHAUL AND MODERNISATION: 16К20 — 3 units, KLOPP 450SK SLOTTING MACHINE, ИЖ250ИТП, ИЖ1И611ПФ, 2Н135, ВМ-127
After operational and machining accuracy acceptance checks, the machines were shipped to the Customers.
2024-11-12 A MAJOR OVERHAUL AND MODERNISATION OF THE ГФ2171С5 CNC VERTICAL MILLING MACHINE WERE COMPLETED. MODERNISATION INCLUDED REPLACING THE CNC CONTROL WITH MAYAK, REPLACING THE FEED MOTORS WITH DELTA SERVO MOTORS, INSTALLING A VARIABLE-FREQUENCY MAIN DRIVE, AND REPLACING ALL ELECTRICAL CONTROL EQUIPMENT, WIRING, CABLE RUNS AND METAL CONDUITS.
Following acceptance checks for quantity, quality, operation and technical accuracy, the machine was shipped to the customer.
2024-11-10 A MAJOR OVERHAUL AND MODERNISATION OF THE NILES DP1 S2 FACING LATHE (Germany) WERE COMPLETED. MODERNISATION INCLUDED REPLACING ELECTRICAL CONTROL EQUIPMENT, WIRING, CABLE RUNS AND THE CONTROL PANEL, AND INSTALLING AN OPERATOR PANEL.
Run-in, functional and accuracy checks completed; the machine is offered for sale.
2024-10-22 MAJOR OVERHAUL AND MODERNISATION OF THE VERTICAL TURNING LATHE, MODEL 1516Ф1, COMPLETED. MODERNISATION INCLUDED A COMPLETELY NEW ELECTRICAL CABINET AND REPLACEMENT OF ALL ELECTRICAL EQUIPMENT, CONTROL SYSTEMS, WIRING, CABLE ROUTES AND FLEXIBLE METAL CONDUITS.
The machine has been successfully shipped to the Customer.
2024-07-23 A MAJOR OVERHAUL AND MODERNISATION OF THE РТ-596 UNIVERSAL SCREW-CUTTING LATHE (ДИП400, distance between centres-1000 mm) WERE COMPLETED. MODERNISATION INCLUDED MANUFACTURING AN ENTIRELY NEW ELECTRICAL CABINET AND REPLACING ALL ELECTRICAL COMPONENTS, ELECTRICAL CONTROL EQUIPMENT, WIRING, CABLE RUNS AND METAL CONDUITS.
Following operational and technical accuracy acceptance tests, the machine was shipped to the customer.
2024-01-12–2024-06-29 THE FOLLOWING MACHINES WERE COMPLETED AND HANDED OVER TO CUSTOMERS FOLLOWING MAJOR OVERHAULS AND MODERNISATION: 1М63, distance between centres-1500 mm, 16К20 – 6 pcs, 6Р82Ш, 2А554, 2Н125, 2Е52, ГС526УЦ
Following acceptance checks for quantity, quality, operation and technical accuracy, the machines were shipped to the customers.
BETWEEN 2023-06-30 AND 2023-11-20, MAJOR OVERHAULS AND MODERNISATION WERE COMPLETED ON THE FOLLOWING MACHINES: 1И611ПФ, 16К20-2 pcs, 6Р82Ш, ARAD SNA–560 (distance between centres-1500).
After operational and machining accuracy acceptance checks, some machines were shipped to the Customers and others prepared for sale.
2023-11-20 ROUTINE REPAIRS AND MODERNISATION OF THE 1516 VERTICAL TURNING LATHE WERE COMPLETED. MODERNISATION INCLUDED MANUFACTURING AN ENTIRELY NEW ELECTRICAL PANEL, REPLACING ALL ELECTRICAL COMPONENTS, ELECTRICAL CONTROL EQUIPMENT, WIRING, CABLE RUNS AND METAL CONDUITS, AND INSTALLING TWO CONTROLLERS AND AN OPERATOR PANEL.
The machine is ready for handover to the customer.
2023-11-10 A MAJOR OVERHAUL AND MODERNISATION OF THE ГФ2171С5 CNC VERTICAL MILLING MACHINE WERE COMPLETED. MODERNISATION INCLUDED MANUFACTURING AN ENTIRELY NEW ELECTRICAL CABINET AND REPLACING ALL ELECTRICAL COMPONENTS, ELECTRICAL CONTROL EQUIPMENT, WIRING, CABLE RUNS AND METAL CONDUITS. A REMOTE PANEL WITH FMS 3100 CNC CONTROL (COMPACT), SERVO MOTORS AND SERVO DRIVES (CHINA) WERE INSTALLED.
An operational demonstration and technical accuracy acceptance tests were completed for the customer.
BETWEEN 2022-09-15 AND 2023-06-30, MAJOR OVERHAULS AND MODERNISATION WERE COMPLETED ON THE FOLLOWING MACHINES: 16К20; ВМ-127, 1М63, 6Р83Ш, 2А554, 1К62-1500, ИЖ250ИТП, 16К25, 2М112
After operational and machining accuracy acceptance checks, the machines were shipped to the Customers.
DURING 2022-10-30–2023-05-05, THREE SCREW-CUTTING LATHES, MODELS 16К30Ф3; 16М30Ф3, UNDERWENT MAJOR OVERHAUL AND MODERNISATION. IN ACCORDANCE WITH THE SPECIFICATION, NEW ELECTRICAL CABINET ENCLOSURES WERE PURCHASED, AND NEW ELECTRICAL EQUIPMENT, CONTROL SYSTEMS, WIRING, CABLE ROUTES AND FLEXIBLE METAL CONDUITS INSTALLED, ALONG WITH NC-202 CNC CONTROL (BALTSYSTEM), SERVO MOTORS AND SERVO DRIVES (CHINA). ALSO AS SPECIFIED, THE MAJOR OVERHAUL INCLUDED COMPLETE DISASSEMBLY OF ALL ASSEMBLIES, SHOT BLASTING AND INDIVIDUAL POWDER COATING OF EACH ASSEMBLY.
Operational demonstration and machining accuracy acceptance completed for the Customer. Accuracy was restored to values better than those specified in the machine documentation.
2022-09-12 MAJOR OVERHAUL AND MODERNISATION OF THE SCREW-CUTTING LATHE, MODEL 165, WITH A DISTANCE BETWEEN CENTRES OF 5000 MM, COMPLETED. MODERNISATION INCLUDED A COMPLETELY NEW ELECTRICAL CABINET AND REPLACEMENT OF ALL ELECTRICAL EQUIPMENT, CONTROL SYSTEMS, WIRING, CABLE ROUTES AND FLEXIBLE METAL CONDUITS.
Following operational and accuracy acceptance checks (taper over a turned length of 400 mm does not exceed 0.02 mm), the machine was shipped to the Customer.
2022-09-09 MAJOR OVERHAUL AND MODERNISATION OF THE SCREW-CUTTING LATHE, MODEL 165, WITH A DISTANCE BETWEEN CENTRES OF 2800 MM, COMPLETED. MODERNISATION INCLUDED A COMPLETELY NEW ELECTRICAL CABINET, REPLACEMENT OF ALL ELECTRICAL EQUIPMENT, CONTROL SYSTEMS, WIRING, CABLE ROUTES AND FLEXIBLE METAL CONDUITS, AND INCREASING THE CENTRE HEIGHT BY 300 MM.
Following operational and accuracy acceptance checks (taper over a turned length of 400 mm does not exceed 0.02 mm), the machine was shipped to the Customer.
2022-01-18–2022-09-15 MACHINES PREPARED AND ACCEPTED BY CUSTOMERS AFTER MAJOR OVERHAUL: 16К20 — 2 units, ВМ-127, ВМ-127 (with digital readout), 2Н150 — 2 units, 3Б634 — 3 units, 3Б632, 3Б636, 1М63, 2М55, 6Р82Ш, 16К20 (with digital readout), TOS FO-6 gear hobbing machine, FXLZD – 160 milling and centring machine, TOS SN-40B lathe.
After operational and accuracy acceptance checks, the machines were shipped to the Customers.
2022-07-13 A MAJOR OVERHAUL OF THE MECHANICAL SYSTEM AND OPTICS OF THE 2Е440А JIG BORING MACHINE WAS COMPLETED (WITHOUT MANUFACTURING A NEW ELECTRICAL CABINET).
Following operational and accuracy acceptance tests (deviation from perpendicularity of the spindle axis to the table surface no greater than 1.5-2 microns), the machine was shipped to the customer.
2021-03-31 A MAJOR OVERHAUL AND MODERNISATION OF THE 16А20Ф3 SCREW-CUTTING LATHE WITH NC-202 DIGITAL CNC CONTROL WERE COMPLETED. MODERNISATION INCLUDED MANUFACTURING ENTIRELY NEW ELECTRICAL CABINETS AND REPLACING ALL ELECTRICAL COMPONENTS, ELECTRICAL CONTROL EQUIPMENT, WIRING, SENSORS AND CABLE RUNS. SERVO DRIVES AND NC-202 CNC CONTROL WERE INSTALLED.
Following operational acceptance tests, including manufacturing the part required by the customer, and accuracy tests, the machine was shipped to the customer.
2022-02-18 MAJOR OVERHAUL AND MODERNISATION OF THE HORIZONTAL BORING MACHINE, MODEL 2620, COMPLETED. MODERNISATION INCLUDED A COMPLETELY NEW ELECTRICAL CABINET, REPLACEMENT OF ALL ELECTRICAL EQUIPMENT, CONTROL SYSTEMS, WIRING, CABLE ROUTES AND FLEXIBLE METAL CONDUITS, AND INSTALLATION OF AN OPERATOR PANEL, SERVO FEED DRIVE AND VARIABLE-FREQUENCY MAIN DRIVE.
Following operational and accuracy acceptance tests, the machine was shipped to the customer.
2021-10-28 A MAJOR OVERHAUL AND MODERNISATION OF THE 6Т83Ш UNIVERSAL MILLING MACHINE, VERSION 40, WERE COMPLETED. MODERNISATION INCLUDED MANUFACTURING AN ENTIRELY NEW ELECTRICAL CABINET AND REPLACING ALL ELECTRICAL COMPONENTS, ELECTRICAL CONTROL EQUIPMENT, WIRING, CABLE RUNS AND METAL CONDUITS.
Following operational and accuracy acceptance tests, the machine was shipped to the customer.
2021-10-26 A MAJOR OVERHAUL AND MODERNISATION OF THE 16М30Ф3 SCREW-CUTTING LATHE WITH NC-201M CNC CONTROL WERE COMPLETED. MODERNISATION INCLUDED MANUFACTURING AN ENTIRELY NEW ELECTRICAL CABINET AND REPLACING ALL ELECTRICAL COMPONENTS, ELECTRICAL CONTROL EQUIPMENT, WIRING, SENSORS, CABLE RUNS, DRIVES AND THE CNC CONTROL WITH NC-201M.
Following operational and accuracy acceptance tests, the machine was shipped to the customer.
2021-06-03 MAJOR OVERHAUL AND MODERNISATION OF THE UNIVERSAL MILLING MACHINE, MODEL 6Т83Ш, COMPLETED. MODERNISATION INCLUDED A COMPLETELY NEW ELECTRICAL CABINET AND REPLACEMENT OF ALL ELECTRICAL EQUIPMENT, CONTROL SYSTEMS, WIRING, CABLE ROUTES, FLEXIBLE METAL CONDUITS AND ELECTRIC MOTORS.
Following operational and accuracy acceptance tests, the machine was shipped to the customer.
2021-02-15–2021-12-30 MACHINES PREPARED AND ACCEPTED BY CUSTOMERS AFTER MAJOR OVERHAUL AND INTERMEDIATE REPAIR: 2Н125; 16К20 — 2 units; 1М63 — 2 units; 2К522; PRAGA-221T; 1В62; 2М55 — 3 units; 2Н135 — 2 units; 6Р10; 3Б634; 6Р13; 6Т83Ш — 2 units; П6330 press; ВМ-127.
After operational and accuracy acceptance checks, the machines were shipped to the Customers.
2021-02-12 FOLLOWING RESTORATION REPAIRS AND MODERNISATION, THE ГФ2171С5 VERTICAL MILLING MACHINE WITH NC-210 CNC AND ARTECH DRIVES WAS SUCCESSFULLY ACCEPTED AND SHIPPED TO THE CUSTOMER.
The machine has been successfully shipped to the Customer.
2021-02-03 FOLLOWING RESTORATION REPAIRS AND MODERNISATION, THE 16А30Ф3 SCREW-CUTTING LATHE WITH NC-201М AND ARTECH DRIVES AND THE МК-1400 FACE-TURNING LATHE WERE SUCCESSFULLY ACCEPTED AND SHIPPED TO THE CUSTOMER.
The machines were successfully accepted by the Customer after operation in all modes and accuracy checks.
2020-06-01 - 2020-12-31 THE FOLLOWING MACHINES WERE REPAIRED AND SHIPPED TO CUSTOMERS: 2А554 - 2 units; 16K20, 1М63БФ101 - 2 units, ИЖ250ИТП, 2Н135.
The machines were handed over following operational and accuracy checks.
2020-12-28 FOLLOWING RESTORATION REPAIRS AND MODERNISATION, THE 16К30Ф3 CENTRE LATHE WITH NC-201М AND LENZE DRIVES WAS SUCCESSFULLY ACCEPTED AND SHIPPED TO THE CUSTOMER.
The machine was successfully accepted by the Customer after operation in all modes and accuracy checks.
2020-12-11 THE MIKRON WF-2 MILLING MACHINE (SWITZERLAND) WAS REPAIRED (INCLUDING MANUFACTURE OF THE MISSING OVERARM AND ARBOR SUPPORT FOR HORIZONTAL OPERATIONS) AND SHIPPED TO THE CUSTOMER.
The machine was successfully handed over to the customer with an operational demonstration.
2020-09-30 THE ИГ1330В PRESS BRAKE AND Н3118 GUILLOTINE SHEARS WERE REPAIRED AND SHIPPED TO THE CUSTOMER.
The machines were accepted by the Customer with an operational demonstration.
2020-09-30 TOS FGSV-50 MILLING MACHINE (Czech Republic) REPAIRED AND SHIPPED TO THE CUSTOMER.
The machine was accepted by the Customer with an operational demonstration.
2020-09-01–2020-11-01 CRANK AND HYDRAULIC PRESSES REPAIRED AND SHIPPED TO THE CUSTOMER: П6332 — 2 units; П6330; П6324, КЕ2326.
Commissioning completed at the Customer's site.
2020-08-18 THE ВМ-127 AND fSS-315 MILLING MACHINES UNDERWENT INTERMEDIATE OVERHAULS AND WERE SHIPPED TO CUSTOMERS.
The machines were accepted by the Customers with operational demonstrations.
2020-06-06 FOLLOWING RESTORATION REPAIRS AND MODERNISATION, THE BEVEL AND HYPOID GEAR CUTTING MACHINE, MODEL 5С280П, WAS SUCCESSFULLY ACCEPTED BY THE CUSTOMER.
Commissioning completed and machine accepted by the Customer.
2020-04-29 THE MIKRON WF-3 CNC UNIVERSAL MILLING MACHINE WAS SHIPPED TO THE CUSTOMER FOLLOWING RESTORATION OF THE BED, KNEE AND TABLE GUIDEWAYS AND TABLE SURFACE, WITH ACCURACY ACCEPTANCE.
The machine was accepted by the Customer following accuracy checks.
2020-03-30 THE 16К20 (3 PCS) AND ИЖ-250 MACHINES WERE SHIPPED TO THE CUSTOMER FOLLOWING AN INTERMEDIATE OVERHAUL AND FACTORY ACCURACY ACCEPTANCE TESTS.
The machines were accepted by the Customer.
2020-03-25 THE 1532 VERTICAL TURNING LATHE WAS SUCCESSFULLY HANDED OVER TO THE CUSTOMER FOLLOWING MODERNISATION (REPLACEMENT OF THE ELECTRICAL CABINET, SENSORS AND CABLE RUNS, AND PLC PROGRAMMING).
Commissioning was completed and the machine was successfully handed over to the customer.
2020-02-28 MACHINES REPAIRED AND SHIPPED TO CUSTOMERS: UE-250V BAND SAW (TAIWAN) AND 2Н135 VERTICAL DRILLING MACHINE.
The machines were accepted by the Customers with operational demonstrations.
2020-01-31 THE РТ-216 (ДИП-800) HEAVY-DUTY SCREW-CUTTING LATHE WAS SHIPPED TO THE CUSTOMER FOLLOWING A MAJOR OVERHAUL AND FACTORY ACCURACY ACCEPTANCE TESTS.
The machine was accepted by the Customer and its accuracy checked.
2020-01-15 THE И1330 PRESS BRAKE WAS SHIPPED TO THE CUSTOMER AFTER ROUTINE REPAIRS.
The machine was accepted by the Customer with an operational demonstration.
2019-10-01–2019-12-31 MACHINES REPAIRED AND SHIPPED TO CUSTOMERS: 6P82Ш; 2H135; SNA ARAD-560; CU-500; UE-250V; 2М55; 16K20, 3Б634, НД3318; 2532Л.
2019-11-22 THE WEILER CONDOR SCREW-CUTTING LATHE WAS SHIPPED FOLLOWING REPAIRS AND MODERNISATION (DIGITAL SCALES AND A READOUT UNIT INSTALLED)/
The machine has been successfully accepted and shipped to the Customer.
2019-10-31 TWO 2А554 RADIAL DRILLING MACHINES WERE HANDED OVER TO THE CUSTOMER FOLLOWING REPAIRS
The machines have been successfully shipped to the Customer.
2019-10-05 REPAIR OF THE 1М63x2800 MACHINE COMPLETED (SCRAPING BED, TOOL SLIDE AND CARRIAGE GUIDEWAYS; MANUFACTURING HALF NUTS; CALIBRATING SCREWS; LAPPING GIBS)
The machine has been shipped to the Customer.
2019-09-30 THE 5А140П GEAR SHAPING MACHINE WAS REPAIRED AND SHIPPED TO THE CUSTOMER.
Commissioning was successfully completed at the customer's premises.
2019-09-27 THE 1М65 SCREW-CUTTING LATHE WITH A DISTANCE BETWEEN CENTRES OF 5000 MM WAS SHIPPED TO THE CUSTOMER AFTER A MAJOR OVERHAUL AND ACCEPTANCE TO FACTORY ACCURACY.
Accuracy checked and machine accepted by the Customer.
2019-08-20 FOLLOWING INTERMEDIATE REPAIR (INCLUDING RESTORATION OF BED, TOOL SLIDE AND CARRIAGE GUIDEWAY GEOMETRY) AND ACCEPTANCE TO FACTORY ACCURACY, THE 1М65 SCREW-CUTTING LATHE WITH A DISTANCE BETWEEN CENTRES OF 2800 MM WAS SHIPPED TO THE CUSTOMER.
Accuracy checked and machine accepted by the Customer.
2019-07-19 THE 3Е184А INTERNAL GRINDING MACHINE WAS SHIPPED AFTER REPAIR, MODERNISATION (INSTALLATION OF A CONTROLLER AND OPERATOR PANEL) AND COMMISSIONING
The customer successfully completed commissioning and put the machine into service.
2019-07-11 AFTER REPAIR AND MODERNISATION (NEW ELECTRICAL CABINET MANUFACTURED, NC-201M CNC INSTALLED), THE 16М30Ф3 SCREW-CUTTING LATHE WAS ACCEPTED AND SHIPPED
Acceptance at the Customer's site was successfully completed.
2019-06-06 MAJOR OVERHAUL OF THE TOS FA5 MACHINE COMPLETED
The machine has been successfully accepted and shipped to the Customer.
2019-03-06 - 2019-09-27 THE FOLLOWING MACHINES WERE REPAIRED AND SHIPPED TO CUSTOMERS: 6Р83Ш; ВМ-127; 2Н135; 2С132; 2Н112; 676; 2А554; TOS BRH-20A; 7А417; 16К20, 16К25, 6Р82Ш, 2Л53У.
Four warranty service visits were made during the above period.
2019-03-06 THE 1510 VERTICAL TURNING LATHE WAS SHIPPED TO THE CUSTOMER FOLLOWING REPAIRS AND MODERNISATION (INSTALLATION OF A NEW ELECTRICAL PANEL AND CONTROLLER).
The 1510 vertical turning lathe was successfully handed over to the customer.
2019-02-21 THE 5К32А MACHINE WAS SHIPPED TO THE CUSTOMER AFTER REPAIR
The 5K32A gear hobbing machine was successfully handed over to the customer following minor repairs.
2019-02-10 THE 2А614-1 MACHINE WAS ACCEPTED BY THE CUSTOMER AFTER REPAIR
The 2А614-1 horizontal boring machine was successfully handed over to the customer following repairs to specification and modernisation, including manufacturing a new electrical cabinet, installing two controllers and installing a digital readout.
2019-01-30 REPAIR OF 3 MACHINES 1М63x2800 COMPLETED
Following intermediate repairs, three machines, model 1М63x2800, were shipped to the Customers.
2018-11-15 THE 1А64 MACHINE WAS ACCEPTED BY THE CUSTOMER
The 1А64 screw-cutting lathe was successfully handed over to the customer. Factory accuracy acceptance tests and commissioning at the customer's premises were completed.
2018-10-08 REPAIR OF THE ВМ-127 MACHINE COMPLETED
The BM-127 vertical milling machine was shipped following a major overhaul.
2018-08-30 MAJOR OVERHAUL OF THE NILES DP1 S2 MACHINE
A major overhaul of the NILES DP1 S2 heavy face-turning lathe has been completed, and it is offered for sale. Accuracy meets the manufacturer's specifications. We provide a 1-year warranty.
2018-07-12 RESULTS FOR THE FIRST HALF OF 2018.
In the first two quarters of 2018, at least 15 (fifteen) universal turning, milling, drilling, grinding and other machines were restored and sold, including the machine 1M63БФ101 (ДИП 300) After a major overhaul; 1M65 (ДИП 500), distance between centres-5000 mm. After an intermediate repair, guillotine shears, model HA3121 (Correcting problems caused by a poor-quality major overhaul).
2018-06-27 FW-400V HORIZONTAL MILLING MACHINE
Horizontal milling machine successfully accepted and shipped FW-400V (Germany). An intermediate overhaul of the mechanical system and modernisation of the electrical cabinet were completed, replacing the relay unit with a modern controller.
2018-06-15 REPAIR OF THE 5A140П GEAR SHAPING MACHINE
A gear shaping machine, model, accepted by the Customer after repair (including faceplate replacement) 5А140П , the electrical cabinet was restored and assemblies and mechanisms adjusted.
2018-05-28 MODERNISATION OF THE ГФ2171С5 MACHINE
Modernisation and intermediate repair completed on the CNC vertical milling machine, model, including restoration of bed, knee and table guideways and the table surface. ГФ2171С5. A variable-frequency drive was installed on the main drive, together with NC-210 CNC control.
2018-04-21 MODERNISATION OF THE 16K30Ф323 MACHINE
Modernisation and a major overhaul, including restoration of the bed, slide and carriage guideways, were completed on the CNC screw-cutting lathe, model 16К30Ф323. Electrical components, electrical control equipment and cable runs were replaced; mechanisms were restored and repaired.
2018-02-21 FSS-400 PS/2 VERTICAL MILLING MACHINE
The vertical milling machine was successfully handed over and shipped FSS-400 PS/2. An intermediate overhaul and electrical cabinet modernisation were completed.
2018-02-02 MODERNISATION OF THE 16К30Ф353 MACHINE
Repair and modernisation completed on the CNC screw-cutting lathe, model 16K30Ф353. Electrical components, electrical control equipment and cable runs were replaced.
2018-01-11 MODERNISATION OF THE 1510 MACHINE
Modernisation and necessary repairs completed on the vertical turning lathe, model 1510.
2018-01-09 FEATURES OF BED GUIDEWAY HEAT TREATMENT
A useful article from the Belarusian-Russian University On the heat treatment of metal-cutting machine bed guideways And more.
2010-12-05 PARTS MANUFACTURING AVAILABLE
We manufacture any parts to the Customer's drawings using metal turning and milling. We guarantee short lead times and quality.
Read more >>>
2010-12-05 WE BUY
We buy metalworking machines, tooling and tools in any condition from individuals and companies. You set the price.
Read more >>>
2010-12-05 SEEKING PARTNERS
All agents, including intermediaries, are guaranteed remuneration for helping sell equipment, as agreed between the parties.
Read more >>>